The Company has acquired 60 acre of land in Morbi district of Gujarat for setting-up their first solar power plant with a capacity of 20 MWAC. The power will be evacuated & injected to a State Transmission Utilities (STU) connected 66 kV GETCO’s Substation and the power generated will be traded under GCPP model to C&I customers through long term PPA. The proposed plant is scheduled to get operational by April ‘2024.